News

Entergy, Superdome, NFL release Super Bowl power outage statement:

CaptureShortly after the beginning of the second half of the Super Bowl in the Mercedes-Benz Superdome, a piece of equipment that is designed to monitor electrical load sensed an abnormality in the system. Once the issue was detected, the sensing equipment operated as designed and opened a breaker, causing power to be partially cut to the Superdome in order to isolate the issue.

Backup generators kicked in immediately as designed. Entergy and SMG subsequently coordinated start up procedures, ensuring that full power was safely restored to the Superdome.

The fault-sensing equipment activated where the Superdome equipment intersects with Entergy’s feed into the facility.

There were no additional issues detected.

Entergy and SMG will continue to investigate the root cause of the abnormality.

VIEW & ADD COMMENTS

1 Comment to “Entergy, Superdome, NFL release Super Bowl power outage statement:”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Advertisement

Advertisement